To Do List & Questions
This is my list of jobs to do on my Mazda Eunos and any questions I still have:
Bodywork
- Fit a rear lip spoiler. I want something fairly subtle, like the KG Works
- Replace the current front grille with some stainless-steel wire mesh, to improve air flow into the radiator.
Braking System
- All 4 brake calipers are being sent off of a full refurb and to be powder coated in red.
- Fit HEL stainless-steel braided hoses.
Chassis
- Purchase and fit roll bar.
Cooling System
- The air-conditioning system seems to be unfixable, so it will be removed.
Fuel System
- No immediate plans.
Electrics
- Wire in dc-dc converter to power video camera direct from battery. This will connect to the Optimate charging lead.
Exhaust System
- All completed.
Instruments & Controls
- Replace throttle pedal bushes - ordered from MX5 Parts.
Seats & Harnesses
- Find some GRP bucket seats that can work on runners.
- Fit some 4-point harnesses.
Steering
- Nothing to do.
Suspension
- The last major job to do is to remove all of the suspension and get it cleaned up and powder coated.
- I will fit new shocks/springs when it is put back together and then get the alignment done.
Transmission
- Change gearbox oil - have this
Miscellaneous
- Fit video camera mount to roll bar.
- Fit external microphone for video camera.